Slideshow Items

Norton Medical Tower South

The build out of the Cancer Institute was originally built in 2012. Our healthcare team finished the 65,000 s.f.  project on the lower level, 2nd & 3rd floors of the Cancer Institute along with the Medical Tower 1st, 2nd, 5th and 6th floors. Maintaining the needed infection prevention measures became the team’s top priority.

Project Details